Energy Minister Visits Olympic Energy Centre

August 2011: Energy Minister Charles Hendry visited the Olympic Park and the park’s Energy Centre which provides power to the main venues in park. The Energy Centre uses both biomass and a natural gas powered Combined Cooling Heat & Power (CCHP) which is 30 percent more efficient than traditional power generation methods. The CCHP system is designed to allow for future increases in capacity – to a maximum load of 120 MW heating, 25 MW cooling and 17 MW of low carbon electricity – enough to power 100,000 homes.

This entry was posted in News and tagged , , , . Bookmark the permalink.

Leave a Reply

Your e-mail address will not be published. Required fields are marked *