New substation for Islington

10 December 2020: UK Power Networks (UKPN) press release announcing “UK Power Networks has finished work on a new substation which is the key to unlocking extra electrical capacity in Islington and its surrounding areas. It is the first step of UK Power Networks’ strategy for North London, which will mean it can decommission older electricity cabling between Hackney-Holloway-Shoreditch and move into a new era with state-of-the-art equipment for the future.

This entry was posted in News and tagged , . Bookmark the permalink.

Comments are closed.